OUTCOME OF SOCIAL AND ECONOMIC DEVELOPMENT OF KYZYLORDA REGION IN 2016 


 

Information on the progress in resolving the problematic issues raised at akims` reporting meetings with the population (07.04.2017)

No.

Problematic issue

Responsible CSB or LEB

Solutions

AGRICULTURE

Issues raised at the meeting of the region akim

1

Ensuring the implementation of the project "Regulation of the Syrdarya River bed and preservation of the northern part of the Aral Sea - 2" ("RSRPNAS-2").

 

Ministry of Agriculture, Ministry of Finance,

Akimat of Kyzylorda region

It is necessary to obtain the consent of the Uzbek side for the implementation of the project RSRPNAS-2. The Uzbek side does not object to the implementation of the RSRPNAS--2 project, subject to the annual discharge of water to the Aydar-Arnasai Lake System in the amount of 1.5 km³ of water from the Shardara reservoir.

The cost of the project is KZT 2,220 million.

- the period of implementation: preliminary 2017-2021;

- source of financing: RB;

-mechanism of implementation: within the framework of the State Program for the Development of the Agro-Industrial Complex of the Republic of Kazakhstan for 2017-2021.

This issue is considered at the level of central state bodies.

Issues raised at the reporting meetings of akims of districts, cities of regional and district significance, rural districts

2

Within the framework of the project "RSRPNAS-2", the construction of a bridge on the Karlan section along the Syrdarya River and protective dams in the interval from Abai village to the Alseit site in Kazaly district. 

 

 

 

 

 

 

 

 

 

 

 

Ministry of Agriculture,

Akimat of Kyzylorda region

The structure of the project RSRPNAS-2 includes the construction of a road bridge near Birlik village in  Kazaly district and protective dams, a length of 29 km in Kazaly district. It is necessary to begin construction of this component from the republican budget (RB). The cost of building the bridge is KZT 3570 million.

The cost of construction of protective dams is KZT 1747 million.

-the time frame for implementation: preliminary 2018-2021;

- source of financing: RB;

-mechanism of implementation: within the framework of the State Program for the Development of the Agro-Industrial Complex of the Republic of Kazakhstan for 2017-2021.

This issue is considered at the level of central state bodies.

3

 The allocation of funds for the re-digging of irrigation canals of Telikol K-1, K-3, K-4, K-9 and drainage from groundwater in Shieli district.

Ministry of Agriculture,

Akimat of Kyzylorda region

Kyzylorda branch of the RSE "Kazvodkhoz" developed a design documentation for the overhaul of the K-1, K-3, K-4, K-9 collectors of the Shieli district. It is necessary (KZT 54 million from the Republic of Bashkortostan) to conduct state expertise of this project. The cost of the project is KZT 846 million.

- the time of implementation: in advance from 2018;

- source of financing: RB;

-mechanism of implementation: within the framework of the State Program for the Development of the Agro-Industrial Complex of the Republic of Kazakhstan for 2017-2021.

This issue is considered at the level of central state bodies.

4

Clearing of canals "Kahar", "Sholakaryk", "Kenesaryk" in Akirek village and construction of water-regulating fencing (lock) in JSC "Zhanakurylys" of Aral district.

Management of Natural Resources and Environmental Governance, Akimat of Aral district

The "Kahar" canal with a length 4.5 km and "Sholakaryk" with a length of 6.7 km are provided with irrigation water at Akirek village, and the Kenesaryk canal with a length 5.8 km is provided by Bekbauyl village. These objects were adopted into the regional communal property in 2016. First of all, it is necessary to develop design and estimate documentation, and after that the issue of repair financing will be considered.

- the period of implementation: preliminary 2018-2019;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the development program for the territory of Kyzylorda region for 2016-2020.

5

Watering of "Tomai" Lake and "Abeken" Canal through the channel of "Aksai" in Kazaly district

Management of Natural Resources and Environmental Governance, Akimat of Kazaly district

The canal "Abeken" with a length of 10.5 km provides irrigation water to Sarykol village. The channel was accepted into the regional communal property in 2016. First of all, it is necessary to develop design and estimate documentation, and then, alternately, to resolve the issue of financing repair work.

- Implementation period: preliminary 2018-2019;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the development program for the territory of Kyzylorda region for 2016-2020.

6

To carry out mechanical cleaning works in the canal "Donenbai" of Bozkol village,Kazaly district

Management of Natural Resources and Environmental Governance, Akimat of Kazaly district

The canal "Donenbai" with a length of 2.3 km provides irrigation water to Bozkol village. First of all, it is necessary to develop design and estimate documentation, and then alternately solve the issue of financing repair work.

term of realization: preliminary 2018-2019;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the Kyzylorda region development program for 2016-2020.

7

Major overhaul of the "Balazharma" channel in  Torebai Bi village and the construction of water retaining structures of Karmakshy district

Management of Natural Resources and Environmental Governance, Akimat of Karmakshy district

The "Balazharma" canal, with a length of 24.5 km, provides irrigation water to Irkol and Torebai Bi villages. First of all, the design and estimate documentation will be developed, followed by the financing of repair works.

- Implementation period: preliminary 2018-2019;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the Kyzylorda region development program for 2016-2020.

8

Construction of water-regulating locks at the mouth of "Jetikol" village in Kuandarya Karmakshy district

Management of Natural Resources and Environmental Governance, Akimat of Karmakshy district

In the beginning, the relevant surveys will be carried out, and after that the development of design and estimate documentation for the hydro-technical facility.

- Implementation period: preliminary 2020;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the Kyzylorda region development program for 2016-2020.

9

Major overhaul of the "Meney" channel in Komekbayev rural district and extension of the canal for 2-3 km of Karmakshy district

Management of Natural Resources and Environmental Governance, Akimat of Karmakshy district

The "Meney" canal, with a length of 2.0 km, provides irrigation water to Komekbayev rural district. First of all, it is necessary to develop design and estimate documentation, and then alternately solve the issue of financing repair work.

- Implementation period: preliminary 2018-2019;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the Kyzylorda region development program for 2016-2020.

10

Clearing the canals "Bozaryk" of  Mailytogai village, "Kok su" of Sulutobe village in Shieli district

Management of Natural Resources and Environmental Governance, Akimat of Shieli district

The "Bozaryk" canal, with a length of 14 km, provides irrigation water to Mailytogai village, the "Kok su" channel, located in Sulutobe, must be transferred to communal ownership.

First of all, it is necessary to develop design and estimate documentation, and then alternately solve the issue of financing repair work.

- Implementation period: preliminary 2018-2019;

- source of financing: regional budget;

- Implementation mechanism: within the framework of the Kyzylorda region development program for 2016-2020.

CONSTRUCTION AND REPAIR OF HOUSING, ENGINEERING AND COMMUNICATION INFRASTRUCTURE

         Issues raised at the meeting of the region akim

11

Reconstruction of the “Teploelektrotsentr” in Kyzylorda.

Ministry of Energy, Akimat of Kyzylorda

region

In the framework of working visits of the First Deputy Prime Minister of Kazakhstan A.Mamin and Minister of Energy of the Republic of Kazakhstan K.Bozumbayev to Kyzylorda region in February this year, this project was supported. According to the protocol instruction of the Government of the Republic of Kazakhstan, relevant work is being done with the Ministries of Energy, National Economy and Finance on signing a loan agreement in July this year.

Grant of the Government of the Republic of Kazakhstan KZT 8900 million.

-the period of implementation: 2017-2020;

- source of financing: EBRD – KZT 8.9 billion, the Government of the Republic of Kazakhstan - 8.01 billion. Akimat of Kyzylorda region – KZT 0.89 billion.

- implementation mechanism: Priority investment plan

This issue is considered at the level of central state bodies.

12

Carrying out of measures on allocation of funds for capital repair of multi-storey apartment houses in Kyzylorda.

Ministry for Investment and Development of RK, Akimat of Kyzylorda region 

As of January 1, 2017, the housing stock of Kyzylorda region has 1167 apartment buildings. 640 houses of them require major repairs. Within the state programs "Modernization of housing and communal services" (2011-2014) and "Development of regions - 2020" (2015-2020) in the period from 2011 to 2016 in the region only 160 MZ were repaired. Budgetary applications for 2017 for 68 multi-apartment buildings were submitted to the Ministry of National Economy of the Republic of Kazakhstan.

The cost of the project is KZT 1195 million.

-Time of implementation: 2017

- source of financing: returnable funds and local budget

- Implementation mechanism (within the framework of the program "Development of regions - 2020"

Issues raised at the reporting meetings of akims of districts, cities of regional and district significance, rural districts

13

Implementation of a sewerage system in Aiteke Bi village of Kazaly district.

Ministry for Investment and Development of RK, Akimat of Kyzylorda region  

In 2013, KZT 227 million was allocated for the development of the DED at the expense of the regional budget. To date, the project has not been completed. The estimated cost of the project is KZT 15 billion.

- the period of implementation - 2018-2020;

- source of financing - RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

14

Renewal of obsolete power grids in rural districts of Zhalagash district.

Ministry of Energy, Ministry for Investment and Development of RK, Akimat of Kyzylorda region   

 

There are 751 km of electric lines in Zhalagash district. Wear of the network is 69% or 518 km. On the part of JSC "KREK", major repairs of the primary electric lines are planned and carried out annually.

- the period of implementation - 2018-2020;

-financial source -RB;

-"Development of regions until 2020" program

This issue is considered at the level of central state bodies.

15

Replacement of obsolete sewage systems in Shieli village of Shieli district and the construction of a new sewage pumping station.

Ministry for Investment and Development of RK, Ministry of Energy, Akimat of Kyzylorda region   

 

 

In 2013, KZT 73 million was allocated for the development of the DED at the expense of the regional budget. To date, the project is not completed. Therefore, it is necessary to optimize costs and consider the issued project specifications.

The estimated cost of the project is KZT 20 billion.

- the period of implementation - 2018-2020;

-financial source -RB;

- the program "Development of regions until 2020"

This issue is considered at the level of central state bodies.

16

Renewal of electrical networks in Kosaman and Belaran settlements of Aral district

 

Management of Energy, Housing and Communal Services,

Akimat of Kyzylorda region

In 2017, at the expense of the funds of JSC "KREK", repair of 35 kV overhead line networks is planned.

-Operation period: 2017 year

-financial source: own funds

17

Reconstruction of multi-apartment residential building No. 62 on Bokeikhan street in Kyzylorda city

Akimat of Kyzylorda city

Capital repair of this house is provided at the expense of repayable funds in 2017.

18

Construction of residential houses for residents of emergency houses in Kyzylorda

Management of Construction, Architecture and Town Planning,

Akimat of Kyzylorda city

To date, there are 32 emergency houses in the region, including:

In Kyzylorda - 30 houses (28 - multi-apartment and 2 - private);

In Aral - 1 house (8 apartments);

In Terenozek village - 1 house (8 apartments).

There are 255 waiting lists in the queue for housing in exchange for an emergency in Kyzylorda.

In Kyzylorda 4 apartment buildings (204 apartments) instead of emergency housing were commissioned. Of them:

In 2013, 1 (24 apartment) house was handed over (Titov village);

In 2015 - 1 (60 apartments) house (Titov settlement);

In 2016 - 2 (60 apartment) houses (Zhappasbay batyr St.).

The solution of this issue is topical, in this connection, the construction of houses in place of emergency will continue.

- The period of implementation: 2018-2020

-financial source: regional budget

- Mechanism of implementation: the Kyzylorda region development program for 2016-2020

GAS SUPPLY

Issues raised at the reporting meetings of akims of districts, cities of regional and district significance, rural districts

19

Providing natural gas to Saksaulsk settlement, Aral district.

Ministry of Energy, Akimat of Kyzylorda region

In 2014-2015, at the expense of the regional budget funds, there were developed projects for the construction of a gas pipeline from the main gas pipeline “Beineu-Shymkent” with the installation of AGDS (automated gas distribution stations), the supplying gas pipeline and intra-quarter gas distribution networks in Saksaulsk village.

To implement these projects in 2016-2017year, the regional akimat sent budgetary applications to the Ministry of Energy and National Economy of the Republic of Kazakhstan. However, the implementation of the project for the construction of a gas pipeline from the main gas pipeline “Beineu-Shymkent” to the installation of AGDS (automated gas distribution stations) by the Ministry of Energy of the Republic of Kazakhstan was supported for 2018-2019, and the construction of the leading gas pipeline and intra-quarter gas distribution networks was not supported by the Ministry of National Economy. The population of Saksaulsk is more than 10 thousand people. In this regard, it is necessary to allocate the necessary amount for the implementation of projects. The cost of projects is KZT 2.4 billion.

- the period of implementation -2018-2020;

-financial source -RB;

- the program "Development of regions untill 2020"

This issue is considered at the level of central state bodies.

20

Providing natural gas to Kosaman rural district in Aral district.

Ministry of Energy, Akimat of Kyzylorda region

At the first stage in 2015, according to the achieved memorandum between the Akimat of Kyzylorda region and JSC “KazTransGas Aimak”, 4 of 7 regional centers (Aral, Aiteke bi, Shieli, Zhanakorgan) and Baikonyr city were gasified.

At the second stage it is planned to gasify the remaining 3 regional centers (Zhosaly, Zhalagash, Terenozek). The total amount of necessary funds from the republican budget is KZT 11.2 billion.

At the third stage of gas supply in Kyzylorda region, the remaining settlements will be gasified as far as their population size, remoteness from the main gas pipeline and the perspective development of the settlement.

403 people live in this settlement. Based on this, it is necessary to gasify from the beginning larger communities.

- the period of implementation - 2019-2021;

-financial source -RB;

-“Development of regions until 2020” program

This issue is considered at the level of central state bodies.

21

Providing natural gas to Aksuat village of Kazaly district.

Ministry of Energy, Akimat of Kyzylorda region

To date, at the expense of the regional budget, a project has been developed for the construction of a gas pipeline from the main gas pipeline “Beineu-Shymkent” with the installation of AGDS (automated gas distribution stations) in Aksuat village.

To implement these projects, the regional akimat will send a budget application to the Ministry of Energy of the Republic of Kazakhstan. The population of Aksuat village is 974 people. In this regard, it is necessary to allocate the necessary amount for the implementation of projects.

The cost of the project is KZT 627.7 million.

- the period of implementation - 2018-2020;

-financial source -RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

22

Providing natural gas to Zhosaly village of Karmakshy district.

Ministry of Energy, Akimat of Kyzylorda region

To date, at the expense of the regional budget, projects have been developed for the construction of a gas pipeline from the main gas pipeline “Beineu-Shymkent” with the installation of AGDS (automated gas distribution stations), the leading gas pipeline and intra-quarter gas distribution networks in Zhosaly village.

To implement these projects in 2016-2017 the regional akimat sent budget requests to the Ministry of Energy of the Republic of Kazakhstan. The population of Zhosaly is more than 19 thousand people. In this regard, in 2017 KZT 500 million was allocated from the republican budget for the beginning of the construction of a gas pipeline from the main gas pipeline "Beineu-Shymkent" with the installation of AGDS (automated gas distribution stations).

We consider it necessary to allocate the remaining amount of KZT 4.8 billion in 2018.

The cost of the project is KZT 5,3 billion.

- the period of implementation - 2017-2018;

-financial source -RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.”

23

Providing natural gas to Toretam village of Karmakshy district                

Ministry of Energy, Akimat of Kyzylorda region

In 2014, at the expense of the regional budget funds, a project was developed for building the leading gas pipeline and intra-quarter gas distribution networks in Toretam village. In order to implement these projects in 2016-2017, the regional akimat sent budget requests to the Ministry of National Economy of the Republic of Kazakhstan.

However, the project of construction of the leading gas pipeline and intra-quarter gas distribution networks was not supported by the Ministry of National Economy.

At the same time, it is necessary to take into account the fact that Baikonyr city, adjoining the settlement, has already been gasified.

In this regard, it is necessary to allocate the necessary amount for the implementation of projects.

The cost of the project is KZT 1.15 billion.

- the period of implementation - 2018-2020;

-financial source -RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

24

Providing natural gas to Zhalagash village of Zhalagash district                          

Ministry of Energy, Akimat of Kyzylorda region

To date, at the expense of the regional budget funds, there have been developed projects for the construction of the leading gas pipeline and intra-quarter gas distribution networks in Zhalagash village. To implement these projects in 2016-2017 the regional akimat sent budget requests to the Ministry of National Economy and Energy of the Republic of Kazakhstan. The population of Zhalagash village is more than 14 thousand people. In this regard, it is necessary to allocate the necessary amount for the implementation of projects.

The cost of the project is KZT 1.5 billion.

- the period of implementation - 2018-2020;

-financial source -RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

25

Providing natural gas to Terenozek village of Syrdarya district  

Ministry of Energy, Akimat of Kyzylorda region

To date, at the expense of the regional budget, projects have been developed for the construction of a gas pipeline from the main gas pipeline “Beineu-Shymkent” with the installation of AGDS (automated gas distribution stations), the leading gas pipeline and intra-quarter gas distribution networks in Terenozek village.

To implement these projects in 2017 the regional akimat sent budget requests to the Ministry of Energy of the Republic of Kazakhstan. The population of Terenozek is more than 8 thousand people. In this regard, it is necessary to allocate the necessary amount for the implementation of projects.

The cost of the project is KZT 5.7 billion.

- the period of implementation - 2017-2018;

-financial source -RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

26

Providing natural gas to Karauyltobe village of Kyzylorda city

Ministry of Energy, Akimat of Kyzylorda region

In 2013, at the expense of the regional budget, a project was developed for the construction of a gas pipeline and intra-quarter gas distribution networks in Karauyltobe village. In 2015-2016 the regional akimat sent budget applications for its implementation to the Ministry of National Economy of the Republic of Kazakhstan. However, this project was not supported. In this regard, it is necessary to allocate the necessary amount for the implementation of the project.

The cost of the project is – KZT 213.7 million.

- the period of implementation - 2017-2018;

-financial source -RB;

- the program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

27

Providing natural gas to Kosshynyrau, Aksuat, Kyzylozek, Aksuat villages of Kyzylorda city

Management of Energy, Housing and Communal Services,

Akimat of Kyzylorda city

On these settlements, to develop design estimates at the expense of the regional budget after the implementation of the current 16 projects for a total of KZT 20.3 billion.

-on the implementation period: 2018-2020

-financing source: regional budget

- Implementation Mechanism: Kyzylorda region Development Program for 2016-2020.

For these settlements, it is necessary to develop design estimates at the expense of the regional budget after the implementation of the current 16 projects for a total of KZT 20.3 billion.

WATER SUPPLY

Issues raised at the reporting meetings of akims of districts, cities of regional and district significance, rural districts

28

Drinking water supply to Shomish, Abai, Karashalan settlements of Aral district.

Ministry of Agriculture, Akimat of Kyzylorda region

 

In 2003 Shomish (430 people), Karashalan (586 people) villages of Aral district were connected to the Aral-Sarbulak group water pipeline. It is necessary to reconstruct the water supply system. Estimated cost of the project is KZT 600 million.

Abai village (2,300 people) uses a local well without a water supply system. Therefore, it is necessary to solve the issue of financing the connection of the settlement to the Aral-Sarbulak group water supply.

The estimated cost of the project is KZT 1.5-2 billion.

- the period of implementation - 2018-2020;

-financial source -RB;

 Direct financing of the Committee for Water Resources of the Ministry of Agriculture of the Republic of Kazakhstan

This issue is considered at the level of central state bodies.

29

Carrying out works on reconstruction of the drinking water system in Zhanakonys settlement of Tan district in Zhalagash district

Management of Energy, Housing and Communal Services,

Akimat of Kyzylorda city 

The population in Zhanakonys village is 160 people. Therefore, we offer the installation of block modules with cleaning (water intake for the population from one point) or the installation of several water-pumping columns with the necessary radius of coverage of residential buildings (according to the norm).

The estimated cost of the project is KZT 15 million.

-the period of implementation: 2018-2019

-financing source: regional budget

- implementation mechanism: the Kyzylorda  region development program for 2016-2020  

30

Allocation of funds for the completion of works on the inclusion of Talaptan, Baigekum, Jolek, Tazhibaev settlements of Shieli district into the Zhideli group water supply.

Management of Energy, Housing and Communal Services,

Akimat of Kyzylorda city  

The Committee on Water Resources of the Ministry of Agriculture of the Republic of Kazakhstan has been implementing the project on connection of 8 settlements of Shieli district (21.8 thousand people) to ZGW since 2013. The cost of the project is KZT 3.7 billion. In the period 2013-2016 only KZT 1.5 billion was allocated. The balance is KZT 2.2 billion. In 2016 3 SNPs were connected (Algabas, Bidaykol, Almaly). To continue construction for 2017, KZT 800 million were allocated. To fully address the issue of financing the water supply of these settlements, an additional KZT 800 million is needed.

- the period of implementation - 2018-2020;

-financial source -RB;

Direct financing of the Committee for Water Resources of the Ministry of Agriculture of the Republic of Kazakhstan

This issue is considered at the level of central state bodies.

31

Drinking water supply to Tartogai, Sulutobe,1 May and Birlestik settlements of Shieli district                               

Ministry for Investment and Development of RK, Akimat of Kyzylorda region

 

These settlements use drinking water from local wells. In order to conduct water supply networks in 2017, it is planned to develop a DED from the regional budget. The estimated cost of the project is KZT 800 million.

- the period of implementation - 2018-2020;

-financial source -RB;

  Program "Development of regions up to 2020"

This issue is considered at the level of central state bodies.

CONSTRUCTION AND REPAIR OF ROADS

Issues raised at the meeting of the region akim

32

Carrying out major repairs of the road "Kyzylorda-Zhezkazgan".

Ministry for Investment and Development of RK, Akimat of Kyzylorda region

One of the problematic issues of the region is the implementation of the project "Reconstruction of the Kyzylorda-Zhezkazgan section of the national road

"Kyzylorda-Zhezkazgan-Karaganda-Bayanauyl-Kalkaman", 424 km long.

This road is of strategic importance for the economy of the region and the republic as a whole, connecting Russia with the countries of Central Asia, the southern regions with the central and northern regions of the Republic of Kazakhstan. The direction of the flow of traffic along this road for Kyzylorda, the near areas of the South-Kazakhstan regions and Uzbekistan significantly reduces the distance to the central regions of the republic and access to the Russian Federation by 850 km.

On 30 June 2016, the Coordination Council on the implementation of the Framework Partnership Agreements between the Government of the Republic of Kazakhstan and International Financial Organizations approved the project "Reconstruction of the Kyzylorda-Zhezkazgan section" of the national road "Kyzylorda-Zhezkazgan-Karaganda-Bayanauyl-Kalkaman", due to loans of the EBRD - $ 200.0 million., ADB -$ 200.0 million in the period 2018-2021.

At present, the borrower of the project JSC "NC "KazAvtoZhol" has begun work on the development of relevant project documentation.

Given the importance of this project for Kyzylorda region, the EBRD Bank needs to make a decision to provide funding for the project in the period 2017-2019.

- the period of implementation - 2018-2021;

- source of financing - due to EBRD loans - $ 200.0 million, ADB -$ 200.0 million in the period 2018-2021.

This issue is considered at the level of central state bodies.

Issues raised at the reporting meetings of akims of districts, cities of regional and district significance, rural districts

33

Construction of a bypass road in Zhalagash village in Zhalagash district.

Ministry for Investment and Development of RK, Akimat of Kyzylorda region

In Zhalagash village more than 14 thousand people live, including 4 thousand people in the southern part along the railroad tracks. A road of republican importance "Kyzylorda-Zhalagash" runs along the southern part of the road from Kazybek bi street of Zhalagash settlement. In this part of the village there are more than 10 social facilities that serve the population of the village. At the same time, in order to develop the village, according to the master plan, engineering and communication infrastructures were carried out on the 60-hectare site of Daumbai, and mass housing of individual housing construction is underway.

Due to the intensive movement of passenger and freight trains, in order to ensure the safety of the population in the district center it is necessary to build a bypass road.

 It is necessary to develop a technical passport with the allocation of a land plot for the construction of a bypass road, to develop a feasibility study and a design and estimate documentation. The estimated cost of developing the feasibility study and the design estimates is KZT 65 million.

Estimated cost of construction is KZT 3000 million.

The construction of a bypass road requires careful study of the expediency of constructing a bypass road, as the akimat of Zhalagash district dismisses this issue.

 This issue is considered at the level of central state bodies.

34

Repair of access roads of settlements Abai, Karaultobe, Kyzylozek, Ainakol, Talsuat, Irkol, Taldyaral settlements in Kyzylorda city.

 

Ministry for Investment and Development of RK, Akimat of Kyzylorda region

The existing condition of the access roads of the settlements of Kyzylorda city is in an unsatisfactory state. One of the main priorities of road repair is the connection of settlements of Kyzylorda city with the regional center. Due to lack of financial resources, roads were not repaired for 20 years. To date, only current repairs and maintenance of roads have been carried out.

Proceeding from this, in 2016, for the repair of access roads to rural districts of Kyzylorda, a length of 34 km, a DED with a departmental expertise was developed.

The cost of the project is KZT 680.4 million.

- the period of implementation - 2018-2019;

-financial source-RB.

- the Kyzylorda region development program for 2016-2020

This issue is considered at the level of central state bodies.

35

Consider the question of replacing the ferry bridge for the pontoon bridge in Kyzylzhar village of Aral district

Management of Passenger Transport and Highways,

Akimat of Aral district

Ferry crossing to Kyzylzhar village through the Syrdarya River has been in operation since 1980. Technical condition is emergency. At the crossing, there are often emergency stops. This causes discontent among the residents of Kyzylzhar, Amanotkel, Rayym, Aklak, Koszhar, Kamystybas, Zhanakurylys villages. In order to address the issue a DED with state expertise was developed at the expense of the regional budget. It is necessary to begin construction of the pontoon bridge in Kyzylzhar village in 2017.

The cost of the project is KZT 88.1 million.

-the period of implementation: 2017-2018

-financial source: regional budget

- Mechanism of implementation: the Kyzylorda region development program for 2016-2020

36

Carry out an average repair of access roads to Torebai Bi, Irkol, Zhanazhol villages of Karmakshy district

Management of Passenger Transport and Highways,

Akimat of Karmakshy district

Roads to Torebay bi, Irkol, Zhanazhol villages of Karmakshy district are in unsatisfactory condition. For these roads an average repair has not been carried out more than 8 years. Thus, the service life of the coating is not met. This, in turn, causes discontent among the residents of the locality.

The implementation of the project will ensure the comprehensive development of Torebay bi, Irkol, Zhanazhol villages of Karmakshy district of Kyzylorda region with a population of 3,612 people. The road will provide transport communication to the settlements of the district, to regional and district centers. The traffic intensity is 200 transport units / day. Repair of highways will allow:

- will provide employment of the population,

- to provide an effective infrastructure.

The cost of projects is KZT 867.2 million.

-the period of implementation: 2018

-financing source: regional budget

- Mechanism of implementation: the Kyzylorda region development program for 2016-2020

37

Accession to the autocorridor "Western Europe - Western China" 7 kilometers of the highway "Samara-Shymkent", passing near Almaly rural district of Shieli district

Management of Passenger Transport and Highways,

Akimat of Shieli district

At the present time, design and estimate documentation is being developed to connect a 7 km long road to the autocorridor "Western Europe - Western China". The accession of highways will provide transport communication between the settlement and the regional center. The traffic intensity is 235 transport units / day.

 The construction of the road will allow:

- to provide an effective infrastructure,

- Ensure employment of the population.

The approximate amount of construction is KZT 150.0 million.

- the period of implementation: 2018-2020

-financing source: regional budget

- Mechanism of implementation: the Kyzylorda region development program for 2016-2020

38

Carrying out of major repair of highway Kelintobe - Koktobe of Zhanakorgan district

Management of Passenger Transport and Highways,

Akimat of Zhanakorgan district

The highway of regional importance "Kelintobe - Koktobe" with a length of 27 km is in unsatisfactory condition. For this road more than 25 years no major repairs have been carried out. Thus, the overhauls of the coating are exceeded. This, in turn, causes discontent among the residents of the locality. In order to solve the problem, it is necessary to carry out major repairs of the motorway at the expense of the regional budget

The project will provide for the comprehensive development of Tugusken, Koktobe, Kandoz rural districts of Zhanakorgan district of Kyzylorda region with a population of 3988 people. The road will provide transport communication to the settlements of the district and to the regional and district centers. The traffic intensity is 256 transport units / day. Repair of highways will allow:

- to provide employment of the population,

- to provide an effective infrastructure.

The cost of the project is KZT 1759.6 million.

- the period of implementation: 2018-2020

-financing source: regional budget

- Mechanism of implementation: the Kyzylorda region development program for 2016-2020

EDUCATION

Issues raised at the reporting meetings of akims of districts, cities of regional and district significance, rural districts

39

Construction of a new kindergarten in Bekarystan Bi village of Kazaly district

Management of Construction, Architecture and Town Planning, Akimat of Kazaly district

There is no kindergarten in Bekarystan village. It is necessary to build a kindergarten for 140 children. This year, funds will be allocated from the district budget for the development of design estimates and state expertise. After completion of the DED and the SE, the issue of project financing will be resolved.

-the period of implementation: 2018-2020

-financing source: public-private partnership

- implementation mechanism: the Kyzylorda region development program for 2016-2020

40

Construction of a new school building in M. Shamenov village of Zhalagash district

Management of Construction, Architecture and Town Planning, Management of Education, Akimat of Zhalagash distrcit

In M. Shamenov village, school No. 34 is in an emergency condition, according to expert opinion No. 262 of 01.09.2016. To build a new school building for 300 seats, KZT 8050.0 thousand was allocated from the district budget. After completion of the DED and the SE, the issue of project financing will be resolved.

-the period of implementation: 2017-2019

- source of financing: clarification of the republican budget for 2017-2019.

- implementation mechanism: the state program of infrastructure development "Nurly Zhol" for 2015-2019

41

Construction of a new school building in Zhanaturmys village of Shieli district

Management of Construction, Architecture and Town Planning, Management of Education, Akimat of

Shieli district

It is necessary to build a new school. The operating school is located in an adapted building, built in 1965, the projected capacity of the school is 120 seats, 209 children are enrolled, in 2017, 248 children are expected to be trained. This year, funds will be allocated from the district budget for the development of design estimates and state expertise. Once the DED and the SE have been completed, the issue of project financing will be resolved.

- the period of implementation: 2018-2020

-financing source: regional budget

- implementation mechanism: the Kyzylorda region development program for 2016-2020

OTHER

Issues raised at the meeting of the region akim

42

Taking measures to improve the social and economic development of Baikonyr city

Ministry of National Economy, Ministry for Investment and Development, Ministry of Finance, Akimat of Kyzylorda region

Approval of the joint long-term Development Program of Baikonur in the framework of the Concept of Further Cooperation at the Baikonur Complex.

First of all, it is necessary to allocate funds from the republican budget for the construction of five 50-apartment houses in Baikonyr city, as well as planning funds under the Program for the development and modernization of the city's engineering infrastructure.

The estimated cost of the project is KZT 2635.3 million.

-the period of implementation: 2017-2018

-financing source: republican budget

 - Mechanism of implementation: the concept of further cooperation on the Baikonur cosmodrome.

This issue is considered at the level of central state bodies.

 

The list of actual problems,

raised at the reporting meetings of akims of all levels with the population

in Kyzylorda region

No.

Events

Period of execution

Form of completion

Solutions

/ RB, RB, DB /

Responsible executor

Coordinator

/ deputy akim of the region /

Aral district

1

Providing natural gas to Saksaulsk settlement of Aral district

2017-2019

Making a proposal

Republican budget

M.Orazbayev

M.Usain

S.Suleimenov

2

Providing natural gas to Kosaman village of Aral district                 

2019-2020

Making a proposal

Republican budget

M.Orazbayev

M.Usain

S.Suleimenov

3

Cleaning of canals "Kahar", "Sholakaryk", "Kenesaryk" in Akirek village and construction of a water-tight fencing (lock) in Zhanakurylys village

2017-2018

Making a proposal

Regional budget

M.Orazbayev

E.Bekzhanov

 

S.Kozhaniyazov

4

Suppying drinking water to Shomish, Abai, Karashalan settlements in Aral district

2018-2020

Making a proposal

Republican budget

M.Orazbayev

M.Usain

S.Suleimenov

5

Renewal of electrical networks in Kosaman and Belaran settlements

2017-2018

Making a proposal

Regional budget

M.Orazbayev

M.Usain

S.Suleimenov

6

Consider the question of replacing the ferry crossing with the pontoon bridge in Kyzylzhar village

2017-2018

Making a proposal

Regional budget

M.Orazbayev

E.Zhanabayev

S.Suleimenov

7

Ensuring the implementation of the project "RSRPNAS-2"

2017-2018

Making a proposal

Republican budget

M.Orazbayev

E.Bekzhanov

S.Kozhaniyazov

Kazaly district

1

Watering of the "Tomai" Lake and "Abeken" Canal through the "Aksai" bed

2017-2018

Making a proposal

Regional budget

N.Shamuratov

E.Bekzhanov

S.Kozhaniyazov

2

Within the framework of the project " RSRPNAS -2", the construction of a bridge on the Karlan section along the Syrdarya River and protective dams in the interval from Abai village to the Alseit site in Kazaly district

2017-2018

Making a proposal

Republican budget

N.Shamuratov

E.Bekzhanov

S.Kozhaniyazov

3

Construction of a new kindergarten in Bekaristan Bi village

2017-2019

Making a proposal

Regional budget

N.Shamuratov

M.Alserikov

B.Sailybayev

S.Suleimenov

4

To carry out mechanical cleaning works in the canal "Donenbai" of  Bozkol village

2017-2018

Making a proposal

Regional budget

N.Shamuratov

E.Bekzhanov

S.Kozhaniyazov

5

Natural gas supply to Aksuat village of Kazaly district

2018-2020

Making a proposal

Republican budget

N.Shamuratov

M.Usain

S.Suleimenov

6

Implementation of a sewerage system in of Aiteke Bi village of Kazaly district

2017-2018

Making a proposal

Republican budget

N.Shamuratov

M.Usain

S.Suleimenov

Karmakshy district

1

To carry out overhaul of access roads to Torebai Bay, Irkol and Zhanazhol villages

2018-2019

Making a proposal

Regional budget

S.Makashov

E.Zhanabayev

 

S.Suleimenov

2

Providing natural gas to Zhosaly village of Karmakshy district

2017-2019

Making a proposal

Republican budget

S.Makashov

M.Usain

S.Suleimenov

3

Providing natural gas to Toretam village of Karmakshy district

2018-2020

Making a proposal

Republican budget

S.Makashov

M.Usain

S.Suleimenov

4

Major overhaul of the “Balazharma” channel in Torebai Bi village and construction of water retaining structures

2017

Making a proposal

Regional budget

S.Makashov

E.Bekzhanov

S.Kozhaniyazov

5

Construction of water-regulating locks at the mouth of "Jetikol" in Kuandarya village

2017

Making a proposal

Regional budget

S.Makashov

E.Bekzhanov

S.Kozhaniyazov

6

Major repairs of the “Meney” channel in Komekbayev rural district and the extension of the canal for 2-3 km

2017

Making a proposal

Regional budget

S.Makashov

E.Bekzhanov

S.Kozhaniyazov

Zhalagash district

1

Construction of a new school building in a / o M. Shamenov village

2018-2020

Making a proposal

Regional budget

T.Duisebayev

M.Alserikov

B.Sailybayev

S.Suleimenov

2

Renewal of obsolete power grids in rural districts of Zhalagash district

2017-2019

Making a proposal

Republican budget

T.Duisebayev

M.Usain

S.Suleimenov

3

Carrying out works on reconstruction of the drinking water system in Zhakonys village of Tan district of Zhalagash district

2017-2019

Making a proposal

Republican budget

T.Duisebayev

M.Usain

S.Suleimenov

4

Providing natural gas to Zhalagash village of Zhalagash district

2017-2019

Making a proposal

Republican budget

T.Duisebayev

M.Usain

S.Suleimenov

5

Construction of a bypass road in Zhalagash village of Zhalagash district

2018-2020

Making a proposal

Republican budget

T.Duisebayev

E.Zhanabayev

S.Suleimenov

Syrdarya district

  1

Providing natural gas to Terenozek village of Syrdarya district                       

2017-2019

Making a proposal

Republican budget

G.Kazantayev

M.Usain

S.Suleimenov

Shieli district

1

Allocation of funds for completion of works on including Tartogay and Telikol rural districts of Shieli district into Zhideli group water supply

2017-2018

Making a proposal

Republican budget

K.Sarsenbayev

M.Usain

S.Suleimenov

2

Joining the autocorridor "Western Europe - Western China" 7 kilometers of the highway "Samara-Shymkent", passing near Almaly rural district

2017-2018

Making a proposal

Regional budget

K.Sarsenbayev

E.Zhanabayev

 

S.Suleimenov

3

Cleaning of the "Bozaryk" canals in Mailytogay village, "Kok su" in Sulutobe village

2017-2018

Making a proposal

Regional budget

K.Sarsenbayev

E.Bekzhanov

S.Kozhaniyazov

4

Construction of a new school building in Zhanaturmys village

2018-2020

Making a proposal

Regional budget

K.Sarsenbayev

M.Alserikov

B.Sailybayev

S.Suleimenov

5

Suppying drinking water to Talaptan, Sulutobe, 1 May, and Birlestik of Shieli district                                   

2018-2020

Making a proposal

Republican budget

K.Sarsenbayev

M.Usain

S.Suleimenov

6

The allocation of funds for the re-digging of irrigation canals Telolik K-1, K-3, K-4, K-9 and work on drainage from groundwater in Shieli district

2017-2018

Making a proposal

Republican budget

K.Sarsenbayev

E.Bekzhanov

S.Kozhaniyazov

7

Replacement of obsolete sewage systems in Shieli village of Shieli district and construction of a new sewage pumping station

2017-2018

Information

Republican budget

K.Sarsenbayev

M.Usain

S.Suleimenov

Zhanakorgan district

1

Carrying out major repairs of the Kelintobe-Koktobe highway

2018-2019

Making a proposal

Regional budget

G.Amreev

E.Zhanabayev

S.Suleimenov

Kyzylorda city

1

Supplying natural gas to Kosshynyrau, Karauyltobe, Aksuat, Kyzylozek villages

2019-2020

Making a proposal

Regional budget

N.Nalibayev

M.Usain

S.Suleimenov

2

Repair of access roads in Koszynyrau, Karaultobe rural districts and Ainakol village in Kyzylozek rural district of Kyzylorda city.

2017-2019

Making a proposal

Republican budget

N.Nalibayev

E.Zhanabayev

 

S.Suleimenov

     3   

Reconstruction of a multi-apartment residential building No. 62 on Bokeikhan street in Kyzylorda city

2017-2019

Making a proposal

Due to the return of funds

N.Nalibayev

M.Usain

S.Suleimenov

    4

Construction of residential houses for residents of emergency houses in Kyzylorda city

2017-2019

Making a proposal

Regional budget

N.Nalibayev

M.Alserikov

S.Suleimenov

The region

1

Ensuring the implementation of the project "RPRNAS-2"

2017

Proposal to the Government of the Republic of Kazakhstan

Republican budget

E.Bekzhanov

S.Kozhaniyazov

2

Reconstruction of the "Teploelektotsentr" in Kyzylorda city

2017

Proposal to the Government of the Republic of Kazakhstan

Republican budget

M.Usain

S.Suleimenov

3

Taking measures to improve the social and economic development of Baikonyr city

2017

Proposal to the Government of the Republic of Kazakhstan

Republican budget

B.Bekpanov

S.Kozhaniyazov

4

Carrying out of measures on allocation of funds for capital repair of multi-storey apartment houses in Kyzylorda city

2017-2019

Proposal to the Government of the Republic of Kazakhstan

Republican budget

N.Nalibayev

M.Usain

S.Suleimenov

5

Carrying out major repairs of the highway "Kyzylorda-Zhezkazgan"

2018-2020

Proposal to the Government of the Republic of Kazakhstan

Republican budget

E.Zhanabayev

 

S.Suleimenov

 

Date created: 23-11-2017 08:52
Updated date: 19-10-2019 12:49
Region
Authority
Law
Business
Nature
State services
Economics
Society
Infrastucture
Information Guide