Information on the current state of the industrial zones of Kyzylorda region

 

894.9 hectares of land were allocated for the creation of industrial zones. To date, 160.5 hectares of land (18.0%) have been developed from allocated land for 38 projects with a total cost of KZT 129.2 billion.

Reference:

• Kyzylorda city - 760 hectares;

• Aral district - 10 hectares;

• Kazaly district - 12.7 hectares;

• Karmakshy district - 15 hectares;

• Zhalagash district - 22 hectares;

• Syrdarya district - 20 hectares;

• Shieli district - 50 hectares;

• Zhanakorgan district – 5.2 hectares.

Industrial zone in Kyzylorda city

• Total land area - 760 hectares, 123.2 (16.2%) of which have been developed;

• 10 projects are located in the industrial zone;

• The volume of investment is KZT 126.3 billion;

• Jobs - 1022 people;

• In general, the total amount of allocated funds from the budget for the provision of infrastructure is KZT 5,7 billion.

Name of the project

Initiator of the project

The cost of projects (mln. KZT)

Jobs

Land area, ha

Current state of the project

1

"Project for the production of wall and sidewalk materials"

  FE"Uzakov"

 KZT

70,0 mln.

43

5 ha

The project has been implemented since February 2015.

2

«Organization of production of polyurethane foam insulation»

"Ecoservice-K" LLP

KZT

135,0 mln.

20

2 ha

Construction work is underway

3

«Construction of a plant for the production and processing of sheet glass with a capacity of 197.1 thousand tons per year»

«Orda Glass» LLP

KZT

 36,7 bln.

226

50ha

The contract for construction and installation works with the Chinese company "China Triumph" has been signed. Construction will be completed in December 2017.

4

«Organization of production of primary metallurgical processing of scrap metal»

«Shah Ismaran» LLP

KZT

500,0 mln.

14

5 ha

Works on external fencing were carried out. To date, work is underway to obtain additional funds. The project PDD is being developed.

5

«Production of foam concrete blocks»

FE«Ardi»

KZT

30,5 mln.

7

1 ha

Preparatory work for construction is underway.

6

«Manufacture of aerocrete blocks»

FE«Ardi»

KZT

32,5 mln.

7

1 ha

Preparatory work for construction is underway

7

«The construction of a pharmaceutical plant for the production of solid dosage forms»

 «Evrazfarma»

LLP

KZT

803,57 mln.

In connection with the refusal of the initiator of the project, a decision was made to exclude this project from the map of support for entrepreneurship in the region under the RCC protocol of 28 March 2017, and work is underway to return the land to state ownership.

8

«Organization of the production of a technical conversion of powder molybdenum dioxide into molybdenum trioxide, with a capacity of 500 tons per year»

 «Trimo»LLP

KZT 871,5 mln.

58

4 ha

The construction and erection works are completed, the first line of technological equipment is being tested. Work is underway to complete the technical passport of the facility.

The initiator of the project works on the acquisition of the second line of equipment. In the second half of 2017 (October) it is planned to put the enterprise into operation.

9

«Construction of a ferroalloy plant»

JSC «SEC «Baikonyr»

KZT 86,7 bln.

600

50 ha

Feasibility study of the project is at the stage of passing state expertise

10

"Establishment of an enterprise for the large-unit assembly of electric submersibles" in Kyzylorda

 «КazPump»

LLP

KZT 374,0 mln.

47

2,25 ha

To date, negotiations are underway with the Russian company (the city of Chelyabinsk) to purchase equipment for the plant. Feasibility study for the project is being prepared. 

 

 

 

Total

 

KZT 126,3 bln.

1022

 чел.

123,2 ha

 

               

 

Industrial zone in Aral district

• The total area of the land is 10 hectares; 6 (60.0%) of them have been developed;

• There are 3 projects in the industrial zone;

• The volume of investment is KZT 529.8 million;

• Jobs - 100 people;

• Allocated funds for infrastructure is KZT 191.9 million from the republican budget, KZT 18.5 million from the local budget. The total allocated amount is KZT 210.4 million, fully mastered.

Name of the project

Initiator of the project

The cost of projects (mln. KZT)

Jobs

 

Land area, ha

Current state of the project

1

"Project for the production of meat and meat products and organization of the dumplings shop"

PF«Bereket»

KZT 38,3 mln.

9

1 ha

Commissioned 

2

"Project for the production of facing bricks"

 «Zhana Aral»

LLP

KZT 131,5 mln.

 

45

1 ha

Construction work is underway

3

"Project for the production of processing of wool and skins"

«Zhana Aral»

LLP

KZT 360,0 mln.

46

4 ha

Construction work is underway

 

Total

 

KZT 529,8 mln.

100 чел.

6 ha

 

 

Industrial zone in Kazaly district

• Total land area - 12.7 hectares, 6.8 (53.5%) ha of which have been developed;

• 10 projects are located in the industrial zone;

• The volume of investment is KZT 428.1 million;

• Jobs - 98 people;

• Allocated funds for infrastructure implementation – KZT 153.6 million from the national budget, KZT 9.4 million from the local budget. Total allocated amount is KZT 163.0 million, fully mastered.

Name of the project

Initiator of the project

The cost of the project(mln. KZT)

 

Jobs

 

Land area, ha

 

Current state of the project

1

"Expansion of the warehouse for storing vegetables and fruits"

FE «B.Bulebayev»

KZT

5,0 mln.

4

0,2 ha

Commissioned.

Works stably

2

«Manufacture of bottled drinking water»

«Zhankent LTD»

LLP

KZT

 15,0 mln.

8

0,2 ha

Commissioned.

Works stably

3

"Electricity supply and services"

 «Energomera» LLP

KZT

40,0 mln.

15

1 ha

Work is underway to obtain a loan for construction works

4

"Construction of a shop for the production of concrete products"

FE «Zh.Karymsakov»

KZT

22,0 mln.

14

1 ha

At the implementation stage. In the second half of 2017 it is planned to put the enterprise

into operation.

5

"Construction of a greenhouse"

FE

«A.Abi»

KZT

10,0 mln.

7

1 ha

In autumn of this year it is planned to begin construction of the greenhouse 

6

"Construction of a vegetable storehouse and a warehouse"

«ArgoOptService»

LLP

KZT

50,0 mln.

10

0,5 ha

To date, work is underway to build the building. In the second half of 2017 it is planned to put the enterprise into operation.

7

"Discoveries of a car park"

«Nurbergen Trans» LLP

KZT 10,0

mln.

5

0,5 ha

At the implementation stage. In the second half of 2017 it is planned to put the enterprise

into operation.

8

"Construction of a warehouse"

FE «S.Yskakov»

KZT

216,1 mln.

10

1 ha

Does not work in connection with financial matters

9

"Project for the production of reinforced concrete products"

FE «R.Mambetzhanov»  

KZT

 50,0 mln.

21

1 ha

Commissioned. 

10

"Construction of a processing center and a reception point for animal skins and fur"

FE «R.Paluashov»

KZT 10,0 mln.

4

0,5

Construction work is underway

 

Всего

 

KZT 428,1mln

98 чел.

6,8 ha

 

 

"Serpin" industrial zone in Zhalagash district

• The total area of the land is 22 hectares, 3.95 (17.9%) hectares have been mastered

• 6 projects are located in the industrial zone;

• The volume of the investment is KZT 109.5 million;

• Jobs - 59 people;

• Allocated funds for infrastructure implementation is KZT 271.1 million from the republican budget, KZT 15.6 million from the local budget. The total allocated amount is KZT 287.3 million, fully mastered.

Name of the project

Initiator of the project

The cost of the project(mln.KZT)

 

Jobs

 

Land area, ha

 

Current state of the project

1

"Cattle slaughter shop"

FE

«D.Zharasbayev»

14,5

3

0,2

Commissioned.

Works stably

2

"Cattle market"

«Kanatbayeva»

LLP

1,5

3

0,1

Commissioned

3

"Sewing factory"

«Orken-alem»

LLP

38,2

25

1

Commissioned.

Works stably

4

"Feeding shop and slaughter of cattle"

FE «К.Kanatbayeva»

25,3

6

0,45

Commissioned.

Works stably

5

"Establishment of a poultry farm in Zhalagash district"

FE «Zhalagash-Kus»

10

10

0,2

Construction work is under way. In the second half of 2017 it is planned to put the enterprise into operation.

6

"Construction of a project for the production of meat and milk and reproduction of thoroughbred goats"

PF «Baba»

20,0

12

2

Construction work is under way. In the second half of 2017 it is planned to put the enterprise into operation. Conclusion of the contract for the acquisition of the used livestock cattle

 

Total

 

KZT 109,5 mln.

59 people

3,95 ha

 

 

Industrial Zone in Shieli district

• The total land area is 50 hectares, 16.5 hectares (32.0%) of which have been developed;

• There are 5 projects in the industrial zone;

• The volume of investment is KZT 1.7 billion;

• Jobs - 175 people;

• Allocated funds for infrastructure implementation is KZT 217.4 million from the republican budget, KZT 16.0 million from the local budget. Total allocated funds KZT 233.4 million, fully mastered.

Name of the project

Initiator of the project

The cost of the project (mln. KZT)

 

Jobs

 

Land area, ha

 

Current state of the project

1

"Construction of the processing of licorice roots"

 «Miya Shieli» LLP

612,0 млн.тг

40

5 ha

Temporarily suspended 

2

"Construction for the production of silica brick"

 «Shieli tas»

LLP

602,0 млн.тг

50

3 ha

To date, the land has been allocated. Work is underway to plan the land and

on obtaining a loan.

3

"Construction of an asphalt-concrete plant"

«Tulpar 2000» LLP

354,0 млн.тг

50

3 ha

To date, work is underway to build the plant. The land has been allocated.

Work is underway on the planning of the land.

The asphalt-concrete plant has been purchased.

4

"Construction and operation of the plant of reinforced concrete products"

 «Shieli Zholshy» LLP

124,0 млн

 

20

5 ha

Commissioned

5

Plant for the production of building materials (lime, polypropylene bags and cinder blocks)

 «Bek-trans stroi» LLP

55

15

0,5

Construction work is under way. Currently, the project of the region akim is being prepared to exclude the project.

 

Total

 

     KZT

1747,0 mln.

175 people

16,5 ha

 

№1 Industrial Zone in Karmakshy district

• Total land area - 15 hectares, 4,1 hectares of which have been developed;

• There are 4 projects in the industrial zone;

• The volume of the investment is KZT 108 million;

• Jobs - 39 people;

For the development of PDD KZT 9.6 million was allocated from the regional budget in 2014. To implement the infrastructure KZT 110.3 million was allocated from the regional budget in 2015. On 28 June, 2016 the industrial zone No.1 was put into operation. To date, work is in progress on the location of projects.

Name of the project

Initiator of the project

The cost of the project(mln. KZT)

 

Jobs

 

Land area, ha

 

Current state of the project

1

"Mir -2001" LLP

"Shop for the production of reinforced concrete products"

45,00

12

2,5 ha

To date, the land has been allocated. The construction will be completed in late 2017.

2

FE "Beribayev"

"Processing of iron residues"

36,0

7

0,6 ha

To date, the land has been allocated. The construction will be completed in December 2017.

3

FE«Rakhmanberdi»

Furniture production

15,0

5

0,5 ha

To date, the land has been allocated

 

FE «Rannar»

 

Warehouse space 

12

15

0,5

To date, the land has been allocated

 

total

 

108

39

4,1 ha

 

Industrial zone in Syrdarya district

The total area of ​​the industrial zone is 20 hectares. KZT 10.0 million was allocated from the district budget for the development of the PDD. The contractor for the development of the PDD has determined the “TekhnaStroyProekt” LLP. The industrial zone of the industrial zone has been developed for the amount of KZT 154.0 million.

Industrial Zone in Zhanakorgan district

The total area of ​​the industrial zone is 5.2 hectares. For the development of design estimates KZT 6.0 million was allocated from the regional budget in 2015. The design estimates for the industrial zone for the amount of KZT 221.0 million have been mastered.

On 5 February this year, the PDD was sent to the Regional Management of Entrepreneurship and Tourism to allocate financial resources.

Date created: 06-12-2017 09:33
Updated date: 21-10-2019 16:26
Region
Authority
Law
Business
Nature
State services
Economics
Society
Infrastucture
Information Guide

©  AKIMAT OF KYZYLORDA OBLAST

All rights are reserved.

When using material from site link to the source is obligatory

Яндекс.Метрика